Mobile Impact Crushing

Delivery term:The date of payment from buyers deliver within days
  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Shandong

  • Validity to:

    Long-term effective

  • Last update:

    2020-02-22 06:27

  • Browse the number:

    365

Send an inquiries
+
Qingzhou BAIYE Agri-Tech Co., Ltd
Contactaixin:

Contactaixin:

qzxyny(Mr.)  

Email:

telephone:

phone:

Area:

Shandong

Address:

No.130 Village Cao, Huanglou District, Qingzhou City

Website:

http://www.baiyenongyekeji.com/ http://qzxyny.alpha-digi.com/

+

Applicable Material:

The mobile crushing plant is designed for road transportation, especially for driving to crushing sites that are difficult to access, which greatly reduce installation time compared with the stationary one. It offers high efficient and low cost project plan without environment limit.


Application:

Mobile crusher is mainly used in hard rock crushing ,aggregate production , outdoor mining crushing,construction waste recycling, cement production and tunnel crushing.


Working principle:

Equipment consists of: vibrating feeder, jaw crusher, or deep cavity "stone at stone" impact crusher, vibrating screen, foldable belt conveyor. To meet customer’s high standard demand, it also can be equipped with cone crusher, sand making machine, or dust removal equipment.

Process: raw materials are fed on to feeder by excavator or wheel loader,then evenly and continuously conveyed into jaw stone crushing equipment for primary crushing. The crushed stone materials are conveyed to secondary stage crusher by belt conveyor for secondary crushing before they are sent to vibrating screen to be separated. After separating, qualified materials will be taken away as final products, while unqualified materials will be carried back to the stone crushing equipment for recrushing. And customers can classify final products according to different size ranges. According to different requirements, customers can adjust the size of their final products from this stone crushing plant. Clients will get the satisfactory products after objects being crushed for several times.

Mobile impact crushers, or mobile impact crushing plants as they are also known, are easily movable and transferable crushing machines used to reduce the size of rocks and other materials in aggregates production, recycling applications, and in mining operations. Depending on the model, mobile impact crushers have either excellent reduction ratios or capabilities to produce precisely shaped cubical end products.


In order to maintain the equipment's good performance, in addition to normal maintenance, the equipment must undergo minor, medium and overhauls as planned.

1) Minor repairs

It is the main form of planned pre-inspection. The purpose is to eliminate the impact of local damage caused by worn parts during the use of the equipment. Some parts are adjusted or replaced to restore the equipment to normal operation. Sometimes pre-inspection work is also performed. Prepare for the next minor or medium or overhaul.

2) Intermediate repair

Maintenance work performed when the equipment is stopped. The purpose is to check the use of important parts of the equipment in detail, replace some parts, and solve the problem of uncoordinated service life of each part. During the middle repair, the entire unit is often disassembled, the parts are cleaned, and the wear of each part is checked.

3) Overhaul

It is maintenance work performed when the equipment is stopped for a long time. During overhaul, all parts must be disassembled and all parts checked carefully. Repair and update all components to fully restore the equipment to normal condition and working capacity. The overhaul includes the entire content of minor and intermediate repairs. In addition, large parts that have reached the end of their life should be replaced.

Among the maintenance methods, the component pre-inspection method is better. This method is performed under the condition of equipment operation. Because the complete components are prepared in advance, the maintenance time is greatly shortened, so the equipment operation rate can be guaranteed accordingly. The part repair method is performed after the equipment is stopped.


http://www.baiyenongyekeji.com/